Skip to content

AASB S2 asks for something specific and awkward: a description of how climate-related risks affect your business, quantified where you can quantify it. For most reporters the hardest part is not the narrative. It is the physical risk evidence — which of our sites are exposed, to what, under which scenario, and how do we know.

That is the part this workflow handles.

What the standard actually asks for

AASB S2 is the Australian implementation of IFRS S2, issued as part of the Australian Sustainability Reporting Standards. It organises disclosure into four pillars:

  • Governance — who oversees climate-related risks and opportunities.
  • Strategy — the risks and opportunities themselves, their financial effects, and your resilience under different climate scenarios.
  • Risk management — how you identify, assess and prioritise those risks.
  • Metrics and targets — including the assets or business activities exposed to physical and transition risk.

The strategy and metrics pillars are where a site-level physical risk assessment becomes unavoidable. You need to say how many assets sit in areas of material physical risk, and you need to have used at least two climate scenarios to get there.

The workflow

Agent prompt

Score our 240 sites against flood, bushfire, coastal retreat and SSP2/SSP5 heat-days, then output the AASB S2 disclosure table with a methodology appendix.

HazardSites at risk2050 SSP5-8.5Exposed value
Riverine flood31 / 240High$84.2m
Bushfire18 / 240High$41.7m
Coastal inundation6 / 240Moderate$22.9m
Datasetsg_nafcadastrega_bushfirensw_flood_studiessilocmip6dea_coastlines
  1. Bring the portfolio. A CSV of addresses, lot/plan references, or coordinates. Leases and owned sites both work; so do supplier and customer locations if that is where your exposure sits.
  2. Resolve to the land spine. Addresses are geocoded against G-NAF, then matched to cadastral parcels. This matters more than it sounds — a rooftop pin sitting 40 metres from a flood planning area boundary gives a different answer to the parcel it actually belongs to.
  3. Join hazard and climate layers. Flood study extents, bushfire-prone land, coastal recession lines and CMIP6 heat projections are intersected with each parcel, at the scenarios and horizons you nominate.
  4. Read the output. An exposure table shaped for the metrics disclosure, plus a methodology appendix naming every dataset, its vintage, its licence and the assumption applied where coverage was incomplete.

What comes out

The disclosure table reports counts and exposed value by hazard, scenario and horizon. The appendix is the part reviewers care about: it lists the flood studies used per council area, flags the sites where no study exists, and records the substitution rule applied in those gaps rather than quietly interpolating.

Gaps are disclosed, not smoothed. Australian flood mapping in particular is uneven — some councils have detailed probabilistic studies, others have nothing digitised. Pretending otherwise is how an assessment fails review.

Who this is for

Group 2 entities reporting from FY2026-27, and Group 3 entities preparing for FY2027-28. If you are a Group 1 reporter already working with a large consultancy, this is useful as a cross-check rather than a replacement.

Frequently asked

Does Zenancy produce a complete AASB S2 report?

No. Zenancy produces the physical risk assessment and the methodology appendix that sit underneath the strategy and metrics disclosures. Governance narrative, transition planning and assurance sign-off stay with your team and your auditor.

Which scenarios does the assessment use?

SSP2-4.5 and SSP5-8.5 by default, at 2030, 2050 and 2070 horizons, drawn from CMIP6 downscaled projections. You can add or change scenarios and horizons per run.

Will an auditor accept open data as a source?

Auditors ask where a number came from and whether the method is reproducible. Every figure Zenancy outputs names its dataset, vintage, licence and the transformation applied, which is a stronger audit trail than most black-box scores.

See it run on your portfolio

Zenancy is in private preview with Group 2 reporters and their advisers.

Request access